Loading...

Learning from Real Structures: UNPRI Architecture Students Conduct Field Study at Medan Housing Projects

: A Tangible Form of Field Study in Providing a Deep Understanding of Construction Processes and Project Management Firsthand.

Education within the Architecture Study Program at Universitas Prima Indonesia (UNPRI) extends far beyond the classroom walls. Every semester, students are encouraged to engage directly with the field, observing and understanding how theoretical concepts are meticulously applied in the real world.

This commitment was exemplified on Tuesday (28/10/2025), when third-semester UNPRI Architecture students conducted a field lecture for their Structure and Construction course at a residential construction site in Tasbih 1 Complex, Medan. On this occasion, a two-story house project served as a living classroom, offering a vivid visual representation of architectural frameworks.

Guided by lecturers Rarma Wardani Siregar, S.T., M.T. and Destia Faradina, S.T., M.T., and supported by professional representatives from Dufragma Arsitek Consultant, Mr. Aditya and Mr. Mahendra, students gained deep technical insights. The session covered foundational systems, columns, beams, and reinforced concrete elements, bridging the gap between design blueprints and structural stability.

"This experiential learning approach is central to UNPRI Architecture's mission. We aim not only to provide theoretical knowledge but also to sharpen students' technical intuition in the field. This ensures they are prepared to face professional challenges in architecture with confidence and competence."

This initiative reflects UNPRI's dedication to SDGs 4 and SDGs 17, fostering high-quality education through industry collaboration. For more information on our academic programs and enrollment, please visit our official website at: www.unprimdn.ac.id. Shape your architectural future with UNPRI.

Writer: Meyga Fitri Handayani, Steven Lioe



News About "Sains dan Teknologi:"

UNPRI, AMD Ryzen AI, dan Microsoft Hadirkan TechGen 2026 di Kampus
2026-02-10 14:33:19 by Muhammad Aditya Kurnia
Wujud Nyata Kuliah Lapangan dalam Memberikan Pemahaman Mendalam Mengenai Proses Konstruksi dan Manajemen Proyek secara Langsung.
FAST UNPRI Jembatani Mahasiswa dengan Raksasa Industri Kaca dan Fasad melalui Knowledge Tour
2026-02-10 14:33:19 by Muhammad Aditya Kurnia
Wujud Nyata Kuliah Lapangan dalam Memberikan Pemahaman Mendalam Mengenai Proses Konstruksi dan Manajemen Proyek secara Langsung.
UNPRI Jadi Tuan Rumah Kompetisi Regional GreenMech Sumatera Utara 2026
2026-02-10 14:33:19 by Muhammad Aditya Kurnia
Wujud Nyata Kuliah Lapangan dalam Memberikan Pemahaman Mendalam Mengenai Proses Konstruksi dan Manajemen Proyek secara Langsung.
FAST UNPRI Gelar Workshop Tiga Hari Penulisan Buku Ber-ISBN dan Strategi Hibah Penelitian
2026-02-10 14:33:19 by Muhammad Aditya Kurnia
Wujud Nyata Kuliah Lapangan dalam Memberikan Pemahaman Mendalam Mengenai Proses Konstruksi dan Manajemen Proyek secara Langsung.
Empat Mahasiswa FAST UNPRI Tembus Prosiding Internasional IEEE Terindeks Scopus
2026-02-10 14:33:19 by Muhammad Aditya Kurnia
Wujud Nyata Kuliah Lapangan dalam Memberikan Pemahaman Mendalam Mengenai Proses Konstruksi dan Manajemen Proyek secara Langsung.

Other News

FKKGIK UNPRI Gelar Yudisium Gelombang II Sarjana Kedokteran Tahun 2025
2026-02-10 14:33:19 by Muhammad Aditya Kurnia
Wujud Nyata Kuliah Lapangan dalam Memberikan Pemahaman Mendalam Mengenai Proses Konstruksi dan Manajemen Proyek secara Langsung.
The 2nd ICOLIFEMED 2025 UNPRI Hadirkan 6 Pembicara Internasional, 405 Makalah, dan 3.100 Peserta dari 8 Negara
2026-02-10 14:33:19 by Muhammad Aditya Kurnia
Wujud Nyata Kuliah Lapangan dalam Memberikan Pemahaman Mendalam Mengenai Proses Konstruksi dan Manajemen Proyek secara Langsung.
PERESMIAN PUSAT PELAYANAN KESEHATAN GIGI DAN MULUT PRIMA
2026-02-10 14:33:19 by Muhammad Aditya Kurnia
Wujud Nyata Kuliah Lapangan dalam Memberikan Pemahaman Mendalam Mengenai Proses Konstruksi dan Manajemen Proyek secara Langsung.

Front Page News


© Universitas Prima Indonesia 2023 - All rights reserved.